Virtual Town Hall Meeting #3

Virtual Town Hall Meeting # 3

On October 9th at 6:30 pm, the Tampa Hillsborough Expressway Authority hosted a Virtual Town Hall Meeting and presented two design options for the Selmon Extension. THEA is asking the public to provide input on which design they like better. Voting will be open until October 20, 2017, until 11:59 pm. Visit selmonextension.com/vote-now to cast your vote.

Questions and Answers

Question

Traffic is already horrible in the afternoon on Gandy bridge eastbound. What will be the impact during construction of the traffic flow?

Answer

Thank you for your question. All lanes of Gandy Boulevard will remain open during peak hours. When the inside lanes of Gandy Boulevard must be closed, they will mostly be done so during nighttime hours.


Question

When Joe started talking, I didn’t hear him until he started asking about Adobe. The Q and A box comes up nicely

Answer

Sounds good here. How does it sound now?


Question

If this is going to be 60′ wide and gandy is only 57′ wide how come the images of this are so small?

Answer

Thank you for your question. The right of way width for Gandy Boulevard is 100 feet.


Question

How come the drawings you list online show the median at 34′ when in median including turn lanes is only 15′ wide?

Answer

The proposed median width is going to be 34′ wide in those without turn lanes unless there are turn lanes.


Question

Gandy is only 57′ wide. the overhead pictured should cover the sidewalks on both sides

Answer

Sidewalks are not covered the viaduct structure extends 1 to 2 feet beyond the inside lane line.


Question

Even your video does not accurately show the width of this. isn’t THEA required under the sunshine law to not mislead the public?

Answer

THEA is not misleading the public.


Question

Plans for keeping businesses accessable?

Answer

We will not close any driveways of businesses during construction without providing an alternative access to the businesses. This will only be required along Westshore Blvd. associated with a City of Tampa widening project that will be built as part of THEA’s project, and along the south side of Gandy Blvd. just to the east and west of Westshore Blvd. Once construction begins, THEA will also have a public information officer onsite who will hold regularly scheduled roundtable meetings with Gandy corridor businesses.


Question

How come all your pictures & videos show this barely extending over the inside lane when it is going to be 60′ wide and Gandy itself is only 57′ wide.

Answer

Gandy Blvd. is generally 100 ft. wide.


Question

What is the point of meeting with the Gandy businesses when all Gandy businesses are opposed to this. if THEA listened to Gandy businesses they would no be building this.

Answer

Many Gandy businesses strongly support this project.


Question

In the latest traffic report done by thea it stated that only 10% of all gandy traffic is regional and the real purpose of this was to bring in 50,000 people from 275 to downtown to bring in new tolls. How does this help south Tampa?

Answer

Our traffic studies estimate that approx. 40% of traffic is passthrough – meaning it has no destination in the Gandy corridor.


Question

Are any of these questions going through? none are displaying or being answered

Answer

We have a record of your questions being answered. After the downhill there will also be a record available of all the questions and answered from tonight’s Town Hall.


Question

So you are going to widen the existing median & turn lanes from 15′ to 34′? the median on the st pete is 34′ wide not the Tampa side. if you extend the medians to 34′ then you would have to eliminate businesses on both sides of gandy

Answer

The Selmon Extension will not cause any businesses to be eliminated.


Question

When will the East bound side of the Gandy bridge be replaced and have any considerations of this been incorporated with this design plan?

Answer

Thank you for your question. FDOT has just begun project development and environmental PD&E study on the Gandy bridge and it’s Eastbound replacement.


Question

Gandy is only 57′ wide. the overhead is 60′ wide. the images only show it coming over the inside lane and the same has been said in all virtual town halls. how is that not missleading the public?

Answer

Gandy Boulevard is generally 100 ft. wide


Question

I have gone out and measured gandy blvd on the TAMPA side in 10 different places and it is 57′ for 95% of it on the tampa side. how can they claim it is 100′ wide? Gandy is only 100′ wide on the ST PETE side

Answer

The right off way is 100′


Question

Is there possibility to combine options? I prefer the Estuary column, but the vivid upper piece

Answer

Thank you for your question. Unfortunately, there is not an option to combine choices. The bottom pier needs to match the top fin.


Question

2 is beautiful

Answer

Thank you for your feedback. Please don’t forget to vote for your favorite design beginning tonight at 7:30pm on selmonextension.com


Question

Your recent study said that only 10% of traffic was pass through which is correct what you are saying now or your study?

Answer

40% of traffic is passthrough, according to our traffic studies.


Question

Gandy has been measured multiple times it is only 57′ wide except at one location where it is 65′ no where on the tampa side is it 100′ wide. that is st pete.

Answer

Gandy Blvd. right-of-way is 100 ft wide.


Question

If you are stating that gandy on the tampa side is 100′ wide you are lying to the public as it has been measured and confirmed multiple times it is 57′ wide it has 2 9′ lanes 2 11′ lanes and a 15′ median

Answer

Gandy right-a-way is 100 ft. wide


Question

The vivid rendering did not show lane lighting for the westbound lanes. Will there be lighting similar to that shown on Estuary?

Answer

Thank you for your question. Yes, aesthetic lighting will be provided for the piers and overhead structure in both designs.


Question

Where can I get more information on the ‘Westshore expansion’ project mentioned in this presentation?

Answer

Thank you for your question. The City of Tampa is in charge of this project. You can get more information from the City of Tampa Transportation Department.


Question

Will entrance to Culbreth Key ever be blocked off

Answer

Thank you for your question. The median opening to Culbreath key will be maintained at all times except during construction of the adjacent pier and then only between the hours of 9pm to 6am.


Question

For gandy to be 100′ wide that would put the lanes at 14′ wide and the median at 34′. that number is ridiculous. is Thea incompetant to come up with that number or lying?

Answer

The right away width contains the median turn lanes, thru lanes and border width which includes the sidewalks.


Question

Who is responsible for the upkeep of the grounds under the connector?

Answer

Thank you for the question. The landscaping will be maintained by the City of Tampa after the project has been completed.


Question

We were told in the last two virtual town halls a noise study would be completed. has that been completed or has thea lied to the public about it?

Answer

The noise study has been completed and is contained in the approved environmental documents.


Question

http://selmonextension.com/thea-investment-grade-traffic-and-revenue-study/ that study states that only 10% of the traffic is pass through.

Answer

Thank you, for future presentations, can you include what is being done for bicycles and pedestrians along GANDY bLVD. Will there be dedicated bike lanes and dedicated cross walks as part of this plan?


Question

Are we able to view those?

Answer

Thank you for participating in our Virtual Town Hall and for your question. All existing crosswalks along Gandy Boulevard will be maintained. Currently, there are no plans for dedicated bike lanes because they would require additional right-of-way and there is no right of way available for this project. However, bicycle improvements will be evaluated in future improvements to Gandy and Palonis parks.


Question

how come you keep stating that gandy is 100′ wide when it is a fact that it is only 57′ wide. you state the median will be 34′ wide when it is only 15 (including turn lanes) how do you explain these inconsistancies?

Answer

The right of way is 100 ft wide


Question

what is the link to the noise study?

Answer

The SEIR is located on the SelmonExtension website.


Question

Gandy blvd is 57′ wide not 100′ Please explain where you are getting 100′ from. the lanes only take up 40′ on both sides. the median is 15′ the run off takes up 2′ where is the additional 43′ coming from?

Answer

Gandy Right-of-way is generally 100 ft wide


Question

If i knew where the noise study was on the website i would no be asking for a link…

Answer

We will send a link to you after the VTHM. We are trying our best to answer questions from many people in real time.


Question

If thea insists that gandy is 100′ wide & the media is 34′ wide that is a flat out lie. isn’t thea required to be honest with the public from the sunshine law?

Answer

Gandy right of way is generally 100 ft. wide


Question

can you also provide a link showing how Thea came up with 100′? you don’t even need to measure to realize that number is ridiculously off meaning Thea is either lying or incompetant. which is it?

Answer

FDOT right of way maps show a 100 ft right of way on Gandy Boulevard


Question

Is the meeting still going on? I’ve tried with Mozilla & Chrome and NO VIDEO from the Media Player within event.on24.com

Answer

The Virtual Town Hall Meeting will be posted to our website, selmonextension.com, within 72 hours. You will be able to view both the presentation and question and answer session. If your have additional questions after this presentation, you can submit your question via the contact form on the website. You can also watch the animated video of the Selmon extension and see the pier renderings at www.SelmonExtension.com.


Question

This is going to be 30′ off the ground and 60′ wide will this handle wind shears up to 150mph? has a study been done to see if the ground will support that much wind? what has been done to prevent another collapse like was done to 275 overhead which was not nearly so tall or wide?

Answer

The bridge is designed to withstand 150 mph winds.


Question

Thank you, one more question, sorry. Regarding the street lights on the extension, do you know the height of the light poles? And has there been any study or data that can be provided on the additional amount of ‘light pollution’ to the existing neighborhoods along Gandy Blvd.

Answer

Thank you for your question. Existing lighting on Gandy Blvd. will remain as is. Lighting on the bridge structure will be 20 ft. above the bridge deck.


Question

Where are you getting that gandy is 100′ wide? on the ST pete side it is but not on the Tampa side. is this being built in tampa or st pete? if in tampa how did they get the measurements so wrong?

Answer

The Selmon Extension is being built in Tampa.


Question

Gandy blvd is 57′ wide not 100′ Please explain where you are getting 100′ from.

Answer

FDOT right of way maps show Gandy right of way as generally 100 ft wide


Question

The lanes of gandy are 9′ & 11′ on each side, the median is 15′ wide including turn lanes. there is 2′ of run off space. that comes to 57′ where is the additional 43′ that you are claiming if gandy is 100′ wide?

Answer

Gandy right of way is generally 100 ft. wide


Question

If this is being built in tampa then how do you explain stating that gandy is 100′ wide in st pete and only 57′ in tampa?

Answer

Gandy right of way is generally 100 ft. wide We are continuing to answer questions.


Question

If this is being built in tampa then how do you explain stating that gandy is 100′ wide in st pete and only 57′ in tampa?

Answer

Gandy right of way is generally 100 ft wide


Question

The lanes of gandy are 9′ & 11′ on each side, the median is 15′ wide including turn lanes. there is 2′ of run off space. that comes to 57′ where is the additional 43′ that you are claiming if gandy is 100′ wide?

Answer

Gandy right of way is generally 100 ft wide


Question

The bridge is designed to withstand 150 mph winds. based on what study? has a simliar overhad been built? is there any basis for this assumption?

Answer

The windloads are based on FDOT and AASHTO guidelines.


Question

How much landscaping is proposed?

Answer

There is $2 million allocated for landscaping in the project.


Question

Where is the fdot map that shows that gandy blvd on the tampa side is 100′?

Answer

We don’t have a link but we can send you the attachment. Can you please send us a request via info@selmonextension.com?


Question

We are concerned about homeless and the prostitution population?

Answer

Thank you for your concern and for participating. The minimum clearance of the bridge is 30′ in height and the narrow median will be almost entirely landscaped with little to no area for congregating.


Question

According to google earth which pulls its info from fdot gandy blvd is 57′ wide. where are you getting 100′?

Answer

The Gandy right of way is 100 ft. wide according to FDOT right of way map. We will be happy to send to you. Please send us a request at info@selmonextension.com


Question

You keep giving me the same answer to different questions that is not answering. i have asked many times if the lanes are 9 & 11′ wide and the median is 15′ where is the other 43′ coming from that you add up to 100′ answering 100′ is not an answer.

Answer

In all due respect, you keep asking the same question. The Gandy right of way is generally 100 ft wide according to FDOT right of way maps, no matter how many times the question is asked.


Question

Can this extension be stopped? we don’t want it

Answer

The Tampa Hillsborough Expressway Authority is proceeding with the project but we appreciate your opinion and participation.

Homeowner Association Presentations

Selmon Extension Project  – Homeowner Association Presentation

THEA is committed to keeping you informed about the Selmon Extension Project. Last month we gave presentations about the Selmon Extension to the Bayside West, Culbreath Key, and Recency Cove homeowners associations, followed by question and answer sessions.  If you live near Gandy Boulevard and would like us to speak to your homeowner association. Please contact us at info@selmonextension.com.

To download a PDF copy of Selmon Extension Project PowerPoint presentation, please, click here.

Video: Virtual Town Hall #2

Virtual Town Hall #2 – General Overview of the Selmon Extension

On September 28th, at 6:00 pm, the Tampa Hillsborough Expressway Authority hosted a Virtual Town Hall Meeting on the in-depth overview of the Selmon Extension. This was the second in a series of Virtual Town Hall Meetings.

Questions and Answers

Question

Why does the marketing material specifically the images of the overhead show as barely extending over the median when in reality it is going to extend 1.5′ over the sidewalk on either side of gandy?

Answer

The overhead will slightly extend 1.5 into the outside lane. It will not extend over the sidewalk.


Question

Hello. Will the support piers be lighted as they (mostly) are for the current elevated lanes?

Answer

Yes, aesthetic lighting will be provided for the piers and overhead structure.


Question

Are you extending it to Gandy?

Answer

The Extension will provide a direct connection between the Lee Roy Selmon Expressway and the Gandy Bridge.


Question

The intersection at Gandy Blvd., and Dale Mabry on the southwest side has only one lane for vehicles exiting, and entering the expressway, causing traffic to criss-cross. Will there be a safer access/exit at this intersection with the extension?

Answer

We will be extending eastbound to southbound movement all the way to Dale Mabry to minimize the weaving problem.


Question

According to the plans it is going to be 60′ wide, with 90% of gandy being only 57′ wide how is it not going to extend over the sidewalk on 1.5′ on either side?

Answer

Your question will be answered during the presentation. Thanks for your patience.


Question

Your own plans show the median as a 34′ wide as typical but there is only a small section where it is wider than 16′.

Answer

The median width includes the turn lanes. Upon completion of the project, there will be a 34′ median, and an 11′ and 10′ ft lane in each direction for the majority of the project. Therefore, the 57′ wide bridge above will extend above slightly into each outside lane.


Question

All traffic statics are theoretical are they not? You have not done a published plate study to know how much traffic is local or through traffic.

Answer

Please refer to our website for previous traffic studies. We are currently preforming an updated origin destination traffic study (same as a plate study) and will post the results on our website.


Question

is THEA considering anything here but the cost? it seems they do not care about hurting local people’s property values and local businesses but building the overhead is causing “inverse condemnation” which opens THEA up to a class action lawsuit by home homers and local businesses www.savegandynow.com

Answer

This project benefits a wide area of the Tampa Bay community. That said, many local businesses and residents in the Gandy corridor support this project, including the South Tampa Chamber of Commerce. The proposed improvement is consistent with local, regional, and state transportation plans. It will address current and future needs of the region for travel, business, and emergency evacuations.


Question

I’ve gone out there and measured Gandy, when turn lanes exist the width of the median and turn lanes is 16′ so a 60′ wide overhead will extend over the sidewalk on either side for 95% of Gandy

Answer

The median width includes the turn lanes. Upon completion of the project, there will be a 34′ median, and an 11′ and 10′ ft lane in each direction for the majority of the project. Therefore, the 57′ wide bridge above will extend above slightly into each outside lane.


Question

After building the toll road, how do the powers that be think people can afford the toll road, it has become so high now average people cant afford the expressway, so how many people will still use Gandy blvd after the Expressway is constructed.

Answer

Extensive studies by our traffic and revenue consultants show that a large amount of regional traffic will utilize the elevated structure with the anticipated toll rates. This reduction of traffic from Gandy Boulevard will improve traffic flow for local drivers trying to access the businesses and neighborhoods along the Gandy corridor.


Question

None of your traffic studies conclusively show that the extension will do anything as the majority of the traffic congestion comes from the intersections of Westshore and Manhattan. without a plate study you have no idea if the extension will help or not correct?

Answer

Traffic congestion is significant at each of the traffic signals on Gandy. Traffic Studies have indicated that a significant amount of traffic will divert to the express lanes thus reducing congestion at the intersections.


Question

I have extensively read your traffic studies, since all the information in your broadcast is theoretical shouldn’t you be telling people that? all these 40% & 44% is a theory and is not supported by any facts.

Answer

The traffic projections are based upon the regional traffic model approved by FDOT and the Hillsborough MPO.


Question

Is this the same presentation that we had before or is there new updates/info?

Answer

Yes, this is essentially the same presentation as the first, with some updated graphics. We plan to have new presentations in the coming months.


Question

I came in few minutes late; has there already been mention cost to the users -in taxes or toll fee increases? Overall the plan sounds good.

Answer

The current project requires no right of way, no taking of businesses, and no taking of homes. The cost of the project, as well as the operation and maintenance of the facility, will be paid from toll revenue and toll bonds. The project will require 0 tax dollars.


Question

Would be great if you guys would say that in the “invitation”. I made a point of being available because I thought you would have updates.

Answer

Sorry about any confusion. We will make sure to be more clear on this going forward.


Question

Traffic studies have indicated? meaning its open to interpretation. haven’t other people that have looked at the study also come up with alternative ways to fix congestion that doesn’t involve destroying the gandy corridor so the board of directors at THEA can bring home a bigger pay check?

Answer

The Expressway Authority conducted a full PD&E study from 2008 to 2010. We had over 100 meetings with stakeholders and we also had a project advisory group made up of local citizens and agencies.


Question

Since the early 90s, there have been discussions and concerns with the traffic on Gandy Boulevard. Many projects have been proposed, but those projects took many resident’s homes and area businesses.

Answer

The Selmon Extension takes no homes, no businesses, is built in an existing median and is being paid for by toll revenues. Not tax dollars. This project is needed for efficient movement of goods and people, and for evacuation purposes.


Question

It does not appear that bicycle lanes are being provided along Gandy. Is that something that won’t be able to be accommodated within the existing right-of-way in the future?

Answer

Additional right-of-way from the businesses located along Gandy Boulevard would be needed to accommodate bicycle lanes.


Question

I have seen the structure, it is being designed for 2 lanes each direction despite you saying its for a single lane. and you are listing the median at 34′ when in reality the median including turn lanes for 95% of gandy is only 16′ wide.

Answer

The single lane ramp with 6 foot shoulders on each side meets FDOT standards to accommodate emergency vehicles and allow traffic to pass by in the event of an emergency.


Question

What will be the speed limit?

Answer

The design speed for the Extension is 50 mph.


Question

Why are there calculations for traffic based on current traffic only? Considering the likely large increase in population (especially Hillsborough).

Answer

Thank you for your question. Our traffic studies include not only current traffic patterns, but projected traffic growth over the next 20 years.


Question

With all the heavy port traffic, incl. lots of semis; plus increased existing & projected residential increases of on & near West Shore Blvd., both S.&N. of Gandy; I cannot understand why there are no ramps on and off at West Shore. Not only that, but this access is crucial to the businesses located between the existing Selmon terminus and the bridge. Why wouldn’t you either install ramps at West Shore, or at least set it up so that they can be added later? This reminds me of the Skyway being insufficient for future use; or the Trop being built to short for existing use.

Answer

Traffic from Westshore Boulevard can head Westbound and utilize the Gandy Bridge (as they currently can now.) However, to provide access to the facility Eastbound would require extensive right of way from businesses around the Westshore intersection, negatively impacting those businesses and local residents.


Question

Why in heaven’s name would you make this extension one lane in each direction, when the existing Selmon and the bridge are two lanes in each direction? Who is planning this? Looks like the same people as the Skyway!

Answer

The traffic projections for those regional travelers bypassing Gandy Blvd via the Extension, only warrant one lane in each direction. Also, there are no plans to widen the Gandy Bridge beyond two lanes in each direction.


Question

Are any of the designers actually drivers of the corridor? Do they realize how difference of speed among drivers (from 55mph to 80mph) of current Selmon drivers will make for extreme frustration and dangerous conditions between slow and fast speed drivers (and increase instances of road rage).

Answer

Yes our designers have driven the corridor and are professionally familiar with the traffic patterns in the area. We acknowledge road rage as a significant issue and thank you for your comments and concerns. Please visit our website for updates. www.selmonextension.com


Question

There is no way these are accurate. What are the basis of these growth numbers. How where the numbers estimated?

Answer

We completed extensive traffic studies, which are based on the regional traffic model approved by FDOT and the Hillsborough County MPO. These studies are posted on our website. We are currently performing an updated origin destination traffic study (same as a plate study) and will post the results on our website once complete.


Question

Also noise doesn’t dissipate when higher out it goes out farther because right now noise is being dissipated by the businesses. Now the noise will go out farther and reach more homes lowering property values.

Answer

The higher structure results in noise waves dissipating at higher elevations, minimizing noise impacts to adjacent property owners.


Question

Are these the same techniques used for the i275 construction that FAILED to properly adjust traffic! Which now has LONGER traffic times after completion!

Answer

I-275 is an FDOT project.


Question

Move the ramps to a West Shore Blvd. interchange, get the trucks off the light at West Shore. Plan for the future increases. South of Gandy (and the DeBartolo property north), are planning huge increases. Are you not conferring with the port? What about the developers. Who is doing this?

Answer

Future development along the Gandy corridor is considered in the regional traffic model. This project will divert a large amount of regional traffic to the elevated structure, freeing up local roads to the increased area residents from the developments you mentioned.


Question

what is the point of 15′ lanes and 6′ wide shoulders on either side? according to FDOT standards the typical lane is 8-11′ wide and one 2-6′ shoulder is required, having double can only mean you want a second lane each direction later after its built. and in the mean time lying to people that it is only going to extend out to the inner turn lanes and not sidewalk to sidewalk

Answer

The lanes on the elevated structure are designed to meet the single lane ramp requirements for a limited access facility per FDOT standards. These standards require a 15′ travel lane and two 6′ shoulders on either side. This configuration will provide adequate space to move disabled vehicles or vehicles involved in an accident to the shoulder and allow room for emergency responders and vehicles to safely operate while still providing room for traffic to move in a single lane.


Question

So I can visualize the difference, how high is the express route that we presently use from the east of downtown going to Brandon ?

Answer

The Extension will be 30′ high from the ground to the top of each pierr. The Reversible Elevated Lanes (REL) between downtown and Brandon have sections that are the same height, but also sections that are lower.


Question

Have there been advances in paint technology since the original reversible lanes were constructed? The original bridge looks quite dirty, so it would be nice if a different paint could be used where that’s less of an issue (if at all possible).

Answer

Yes, there have been in advances in paint technology since the original REL. We will incorporate those newer technologies into our design when possible.


Question

Is there any portion of this study that shows an alternate of having two lanes on the elevated expressway.

Answer

The structure is designed to meet FDOT standards for a single-lane ramp on a limited access facility.


Question

Is the standards approved by FDOT and Hillsborough MPO created in the same method that lists a 16′ median as 34′? and a 60′ wide structure that extends and hangs over each side of the sidewalk on either side when the image shows it barely extend out 16′?

Answer

The median width includes the turn lanes. Upon completion of the project, there will be a 34′ median, and an 11′ and 10′ ft lane in each direction for the majority of the project. Therefore, the 57′ wide bridge above will extend above slightly into each outside lane.

2016 Economic & Business Impact Study

Assessing the Economic & Business Impacts of the Selmon Extension

The Tampa Hillsborough Expressway Authority (THEA) is conducting an evaluation of a proposed Gandy Boulevard improvement project directed at serving regional traffic coming to and from the Gandy Bridge. The proposed build alternative considers an elevated structure connecting the Gandy Bridge with the western termini of the Selmon Expressway. While this solution primarily targets regional traffic and the reduction of local congestion, concerns about potential impacts on local businesses have been raised during the project advisory group presentations.

THEA contracted the Center for Urban Transportation Research (CUTR) at the University of South Florida (USF) to conduct a study of the business impacts of the proposed improvement. The goal is to assess and quantify the changes in sales revenues and employment that are likely to occur as regional and local traffic patterns change once the proposed alternative becomes operational. In addition, THEA retained CUTR to identify and quantify the temporary impacts to businesses during the construction phase of the proposed alternative.

Download the USF Economic & Business Impact Study

Video: Virtual Town Hall #1

Virtual Town Hall #1 – General Overview of the Selmon Extension

On August 24th, at 6:00 pm, the Tampa Hillsborough Expressway Authority hosted a Virtual Town Hall Meeting on the General Overview of the Selmon Extension. This was the first in a series of Virtual Town Hall Meetings.

If you missed the meeting or would like to replay the meeting, you can do so by watching the video below.

 

Questions & Answers from the Selmon Extension Virtual Town Hall – August 24, 2016

Download the Question & Answers from the Selmon Extension Virtual Town Hall

Question Response
1 End date 2020. Hopefully this will be early 2020 or sooner. Any chance of early completion? Our current schedule is for a early 2020 completion.
2 When do you expect actual construction to begin? Thank you for your question. This will be covered in the presentation but we anticipate construction to begin in late 2017.
3 Why just one lane in each direction?

FDOT has no plans in a 50 year horizon to replace the Gandy Bridge. Because only 40% of the traffic is regional, only one lane is needed effectively handle the present (and future) regional traffic.

The Selmon Extension lanes will be free of traffic signals which means they can carry many more trips. The new lanes will provide a non-stop trip between the current western terminus of the Selmon Expressway and the western end of the Gandy Bridge in Pinellas County.

4 Will Gandy be down to one lane of traffic going each way during construction? two lanes in each direction will be maintained during peak hours.
5 When does construction start Thank you for your question. This will be covered in the presentation but we anticipate construction to begin in late 2017.
6 When will construction start? Thank you for your question. This will be covered in the presentation but we anticipate construction to begin in late 2017.
7 Will tolls be increased for whole crosstown or just additional for the extension part you travel? there will be a separate toll for the Extension, the amount of which has not yet been determined. Tolls on the Selmon Expressway will remain the same.
8 Will we hear the discussion online Yes, you should hear the audio through your computer speakers. Please refresh your browser window and make sure your speakers are turned up in order to hear the audio.
9 The invitation’s drawing shows a new southward entrance to Selmon at Dale Marby.
How does this affect the existing exits 1A and 1B?
Thank you for joining tonight. All existing entrances will remain with a new southward entrance added as referenced in the drawing.
.
10 What will be the sound barrier methods to reduce traffic noise for residents by Gandy Blvd? a new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
11 St. Petersburg saw heavy construction during the night for the extension.
How will this be prevented for South Tampa?
What about possible impacts of construction delays?
construction will occur during night, when traffic flow on Gandy Blvd is minimal. THEA will be respectful to surrounding Gandy neighbors.
12 How tall will it be? There are many cables crossing Gandy. Will traffic flow on Gandy be interrupted? Thank you for joining. The lowest point in the bridge structure is 30 feet above the ground. All electrical distribution cables will be buried underground. Two thru lanes in each direction will be maintained during all peak hours.
13 How will THEA compensate the existing businesses The Selmon Extension is located in the median of Gandy Boulevard. We will not be purchasing any right of way; no businesses will be impacted. However, THEA will continue to work with Gandy corridor businesses to minimize impacts during construction.
14 Whycant you synchronize the lights to improve flow? The signal timing systems will be reconfigured at the completion of the project to improve traffic flow based upon the new traffic patterns.
15 Businesses will lose customers and $$ while the extension is constructed. How will THEA compensate them for loss of business over the construction period? The Selmon Extension is located in the median of Gandy Boulevard. We will not be purchasing any right of way; no businesses will be impacted. However, THEA will continue to work with Gandy corridor businesses to minimize impacts during construction.
16 One of the main reasons THEA uses for installing this structure is that the businesses along Gandy will experience an increase in business due to rush hour traffic being less. The projected reduction in the number of vehicles is certainly not enough to make Gandy’s rush hour traffic so much better that people will be more inclined to visit a business on Gandy during peak traffic times which ensures there will be no increase in business during rush hour. Why has THEA not included this very important information in any of their data and propaganda they have provided to the people? Thank you for your question. Our traffic analysis with the Extension in place shows a significant time savings for drivers on Gandy Boulevard. Signal wait times would be reduced by an average of 44%, and end-to-end Gandy Boulevard travel times would be cut by 40%. When compared to “no-build option” these time savings would be sustained over the entire 30-year planning horizon.

As a result, customers driving to Gandy Boulevard businesses will have enhanced travel times on Gandy Boulevard. Preliminary economic studies from the University of South Florida indicates these time savings for destination-businesses would benefit from the improvement. That study will be out in September and we will post on the Selmon Extension website.

17 So you are saying that you are not going to use any tax payer dollars? Thank you for joining us Sarah.The Selmon Extension will be built with zero tax dollars. All funding will utilize toll revenues from Expressway users and toll bonds sold by the Expressway Authority. THEA toll bonds are not state debt.
18 How will this help alleviate North Bound traffic delays from MacDill Air Force Base to Gandy Blvd, including S. Dale Mabry Hwy, S. Manhattan Avenue and S. West Shore Blvd? This project will remove a large portion of the turing traffic at the Gandy Dale Mabry allowing longer greens times for Northbound thru traffic during the afternoon rush hour.
19 Would there be a NB entrance onto Selmon off of Dale Mabry? the existing entrance will remain
20 The mailer that was sent out by Constant Contact had a rendering that showed pretty landscaping below the huge concrete overhead bridge. Nothing grows under the existing elevated crosstown along Hwy 60. Why should we believe that anything will grow under this new proposed bridge? This Bridge will be over 12 feet higher than the existing Selmon bridge allowing more sunlight during the day for landscaping growth.
21 So you can destroy neighborhood property values to serve regional travelors? Since the early 90s, there have been discussions and concerns with the traffic on Gandy Boulevard. Many projects have been proposed, but those projects took many resident’s homes and area businesses. The Selmon Extension takes no homes, no businesses, is built in an existing median and is being paid for by toll revenues. Not tax dollars. This project is needed for efficient movement of goods and people, and for evacuation purposes.

Project concerns have been received and addressed. The proposed improvement is consistent with local, regional, and state transportation plans. It will address current and future needs of the region for travel, business, and emergency evacuations.

22 What do you mean by public art? Will it be murals on the stantions? Distracting and possibly ugly depending on individual tastes. Thank you for joining and for your question. Public input will be sought to develop pier aesthetics, including textures and colors as well public art in appropriate locations to beautify the project.
23 Higher structure spreads the traffic noise further into residential areas the higher structure results in noise waves dissipating at higher elevations, minimizing noise impacts to adjacent property owners.
24 How many traffic lanes will there be on the extension. Thanks for joining us this evening. Because only 40% of the traffic is regional, only one lane each way of the Selmon Extension is needed effectively handle the present (and future) regional traffic.
25 What about the businesses, loss of revenue during construction? The Selmon Extension is located in the media of Gandy Boulevard. We will not be purchasing any right of way; no businesses will be impacted. However, THEA will continue to work with Gandy corridor businesses to minimize impacts during construction.
26 The Constant Contact survey had only 888 respondents which is a very small sample. The online survey could also be taken multiple times by the same person which could have tilted the result in favor of THEA’s desired result of having public support. How can this survey be considered to be credible? Thank you for your question. The constant contact survey is only one outreach effort we are doing to gather public and business input. We are committed to engaging with the Gandy area community and will continue to seek your input.
27 Where will the toll booths be located on the extension? The toll gantries will be located in the existing Selmon interchange area at Gandy Blvd.
28 When is construction slated to start on the Tampa side of the bay? the project has anticipated late 2017 construction start date.
29 The Constant Contact survey had 888 respondents with 54% saying the pretty color (and misleading) rendering ‘looked like a good idea’. 54% of 888 is only 480 positive responses. In 2009 the Save Gandy opposition group had more than 1,000 signatures of people opposing the project. How can THEA honestly feel like they have public support for the project? Thank you for your question. This project benefits a wide area of the Tampa Bay community. That said, many local businesses and residents in the Gandy corridor support this project, including the South Tampa Chamber of Commerce. The proposed improvement is consistent with local, regional, and state transportation plans. It will address current and future needs of the region for travel, business, and emergency evacuations.
30 Safety features of the extension? What would prevent a car that was in an accident from hydroplaning/falling off the extension causing possible injuries below? Any precautions? thank you for the question. Standard barrier walls will be located both along the outside and along the media of the Extension to contain vehicles in the event of an accident.
31 And its completion date? anticipated completion date is early 2020.
32 Bridges are shut down during winds associated with hurricanes. This destroys the extension,s use and the Gandy Bridge’s use, the west side of which floods in storms. Not a good hurricane evacuation route. Thanks for joining us tonight. Residents will be asked to evacuate 72 hours prior to landfall. The three bridges will not be closed until closer to the storm making landfall.
33 There is no logic in this concept. traffic heading North from the base must still cross Gandy to access the extension. The traffic back up occurs in the North Bound lanes prior to reaching Gandy. How will the extension relieve that build up without the extension also starting/ending near the base thank you for your question. The current 2016 study shows that the average daily traffic on Gandy Boulevard from Gandy Bridge to Dale Mabry is 45,175. We estimate that approximately 40% of weekday trips now and in the future, will use the Extension. That’s approximately 16,000 vehicles per day. This number will grow significantly over the next 30 years.

In addition to the investment grade traffic and revenue study, we are also counting how many cars come over the Gandy Bridge and then either get on to the Selmon Expressway, or go to MacDill Air Force Base. These drivers would be the primary users of the Selmon Extension. That report is expected to be complete in January of 2017.

34 how much increased volume do you anticipate on existing selmon expressway? There is a traffic and revenue study currently underway to predict the increase in traffic.
35 Your response to my question about landscaping not growing under the overhead roadway states the Gandy overpass is 12 feet higher than the existing elevated expressway along Hwy 60. This is factually false. The existing elevated expressway along the south side of Hwy 60 near the Port of Tampa is NOT only 18 feet high. Can you please explain your answer? Apologize, thought you meant the intersection of Gandy & Dale Mabry. Yes, on highway 60, the bridge is quite tall, but it’s 8 lanes, with the three lanes of the REL above that. Very difficult for light to get through. In addition, that area was used for storm water management facilities. Therefore no landscaping was planned for that area.
36 How much did you says the toll cost expected to be? thank you for your question. it is not yet known at this time what the Extension toll will be.
37 So the Gandy Bridge is going to be a double-decker? thank you for your question. FDOT has no plans in a 50 year horizon to replace or double deck the Gandy Bridge.
38 How are you going to merge onto Gandy Bridge? thank you for the question. Traffic from the Extension will merge onto the Gandy Bridge with existing lanes.
39 Is the Ad in November 2017 or LOI Due? the anticipated advertising date is in November or December 2016.
40 Sorry if I missed this, but is there an extension exit that allows northbound access to Dale Mabry (only saw southbound in the relevant graphic)? Yes, the exits that exist today will remain, the extension will merge with that loop ramp for traffic that wish to go north or south on Dale Mabry
41 2 Lanes open: does that mean 1 lane in EACH direction during construction, two lanes will remain in each direction during peak hours.
42 2 lanes each direction ? thank you for your question. During construction, two lanes will remain in each direction during peak hours.
43 How is the construction going to affect the residents of Culbreath Key? We only have one entrance and exit and it is directly onto Gandy? What is planned for us? Thank you for your questions. Your existing entrance will be maintained. The extension will be built in the median of Gandy Boulevard. THEA will not be touching the driveways of the homes or businesses
44 Did I understand the presentation correctly that the extension will only be two lanes with one going in each direction. Thank you for your question. The Extension will add 2 lanes (one in each direction) to separate Gandy corridor through trips from trips destined for Gandy Blvd. This provides significant traffic relief on Gandy Blvd that will provide sustained travel time savings through the foreseeable future.
45 If the overhead roadway is built Gandy’s neighborhood main street character will be destroyed. Why should a massive concrete structure that ruins the main street feel be installed to alleviate some traffic for 3 to 4 hours a day, especially when the commuters who get to save a few minutes do not even live in the Gandy area? At build out, The Gandy Extension will significantly alleviate traffic congestion along Gandy Blvd. by segregating “pass through” commuter traffic from neighborhood traffic. The Gandy Extension will reduce travel times while greatly improving hurricane and other emergency evacuation safety protocols.
46 Is the extension going to be on lane in each direction or two? The Extension will add 2 lanes (one in each direction) to separate Gandy corridor through trips from trips destined for Gandy Blvd. This provides significant traffic relief on Gandy Blvd that will provide sustained travel time savings through the foreseeable future.
47 Do we have a graphic projecting what the on & off will look like? Thank you for your question. We are currently having a graphic of the ramp being designed and it will be posted on the Tampa Hillsborough Expressway website. Also, please go to http://www.tampa-xway.com/contact-us/ to sign up for our newsletter to stay in touch regarding the project.
48 why not 4 lanes on the extension, will be needed in near future. Thank you for your question. FDOT has no plans in a 50 year horizon to replace the Gandy Bridge. Because only 40% of the traffic is regional, only one lane is needed effectively handle the present (and future) regional traffic.

The Selmon Extension lanes will be free of traffic signals which means they can carry many more trips. The new lanes will provide a non-stop trip between the current western terminus of the Selmon Expressway and the western end of the Gandy Bridge in Pinellas County.

49 How many exit and entry ramps? Where is the space to flow into Gandy Bridge? Are you going to widen Gandy Bridge, it is already very heavy traffic at rush hours. Thank you for your question. The Selmon Extension will provide direct access between the Lee Roy Selmon Expressway and Gandy Bridge. Traffic will merge onto the Gandy Bridge using existing lanes. FDOT has no plans in a 50 year horizon to replace or widen the Gandy Bridge.
50 Where will the toll be collected? Thank you for your question. The toll gantries will be located in the existing Selmon interchange area at Gandy Blvd and Dale Mabry
51 how and when will businesses have input as to the pier locations Thank you for your question. We plan to have our next town hall meeting in October on pier design options. We hope you will participate!
52 Will the sidewalks on Gandy remain the same size? Or will there be support columns from the extension blocking the sidewalk? Thank you for your question. The sidewalks will remain the same size. The extension will be built in the median of Gandy Boulevard.
53 will the tolls be increased on all of the Selmon roads Thank you for your question. We are still determining the price for the Selmon Extension but existing tolls on the remainder of the system will not be changed.
54 I see the veterans expressway is ongoing for the last 10 years with no finish in sight. Will this project be managed by the same people/company? Thank you for your question. The Veterans Expressway is managed by Florida’s Turnpike Enterprise. The Selmon Extension is managed by the Tampa Hillsborough Expressway Authority.
55 What is the noise impact for the neighborhood? Thank you for your question. Construction noise can be anticipated but will occur more at night than during daylight hours. In addition, the after effects of this type of construction lower the noise volumes on Gandy Blvd.
56 What kind of noise factor will there be during night construction? The contractor will be required to minimize noise during nighttime construction, however there will be unavoidable evening construction noise.
57 How about the people going to Pinellas. Those leaving Tampa to Pinellas will not have to stop at the lights along Gandy Blvd. if they take the Extension or they would have the option of staying on Gandy.
58 Is the toll price expected to at indefinitely or is there a time period during which the toll will be charged? Thank you. The toll will be charged at all times except for emergency evacuations.
59 What will be the price of the tolls on the proposed extension? At this time, the price of the toll on the Extension has not yet been established.
60 I tuned in late and may have missed it. What is the projected toll going to be to utilize this extension? Thank you for your question. At this time, the toll for the Extension has not yet been established.
61 Ae Gandy and Dabry the only entry points in South Tampa? Will there be an entry near West Shore Blvd? Thank you for your question. Travelers can access the Extension from either the Gandy Bridge, Dale Mabry or the Lee Roy Selmon Expressway. There will be no entry/exit on West Shore Blvd.
62 In your response to my question regarding the Constant Contact survey having far fewer positive responses than the number of people who signed the opposition position, you said THEA will continue to seek our input. We do not feel this is genuine. Why have there been no public meetings like in 2009 so the neighborhood residents can show up to protest something that ruins their neighborhood main street? Thank you for your question. The Virtual Town Hall is the first in a series. This method of outreach allows more people to participate in the comfort of their homes, plus it will be available on-demand, 24 hours a day, via our website at www.selmonextension.com.
63 When will you know what the toll price will be? Thank you for your question. The toll price will be determined upon completion of the traffic and revenue study currently underway.
64 How will exterme rainfall impact Gandy Blvd from the extension? Thank you for your question. All stormwater runoff from the new structure will be piped directly from the existing underground outfall structures along the north side of Gandy Blvd thus reducing the effect on Gandy Blvd.
65 how much extra will it cost? Thank you for your question. Tt is not yet known at this time what the Extension toll will be.
66 So all traffic will bottleneck at the bridge? Thank you for your question. The Extension will add one lane of traffic for regional travelers. This will improve traffic on Gandy Boulevard for local traffic.FDOT has no plans in a 50 year horizon to replace the Gandy Bridge. Because only 40% of the traffic is regional, only one lane is needed effectively handle the present (and future) regional traffic.

The Selmon Extension lanes will be free of traffic signals which means they can carry many more trips. The new lanes will provide a non-stop trip between the current western terminus of the Selmon Expressway and the western end of the Gandy Bridge in Pinellas County.

67 Have the bonds been approved and by what authority? How will cost overuns be funded? Upon approval of the traffic an revenue study, THEA will go to the bond market to sell bonds for project funding appropriate contingency funding will be including to handle costs overruns.
68 Where is the interchange area at Gandy Blvd? Where the existing Selmon Expressway crosses Gandy Blvd.
69 Have you studied the economic impact on south tampaTampa property values? A economic impact study has been performed by USF forTHEA. The study should be published on the website by September 1
70 Hello, will all financing be in place prior to start of construction or will financing be a part of the contract to build the project? We will have the financing in place before the start.
71 How far away will you see the bridge from the neighborhoods and will noise be a factor? From the neighborhood perspective, local tree cover will minimize the visual impact of the extension. We are currently doing a noise study to determine areas that need sound barriers.
72 Will you be able to use your sunpass Yes
73 So confused about how the lanes will converge before the bridge… Thank you for your question. Westbound traffic coming down from the overhead bridge will enter an additional third lane on Gandy Blvd. Appropriate merge areas will be provided to reduce down to two lanes before the Gandy Bridge.
74 Are the additional turn lanes proposed for Westshore still in the works. The Extension will remove enough traffic from existing Gandy Blvd to eliminate the need for dual left turns onto Westshore. Existing turn lanes will be lengthened.
75 Have any sound studies been done for Culbreath key residents? we are forty feet up. higher up is not better fo us. A new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
76 Can you elaborate on the other constructio projects you mentioned at the beginning of the presentation? 275 was mentioned The Expressway Authority is going to construction in 2017 and wants to be open to traffic by 2020. In 2020, the interchange at 275 and 60 (Howard Frankland Bridge & Kennedy) will begin re-construction. A new span of the Howard Frankland bridge is also scheduled to go to construction around that same time
77 who is hosting this webinar? Sue Chrzan, Director of Communications for the Tampa Hillsborough Expressway Authority
78 Where does the extension join the existing Gandy Bridge? Thank you for your question. The Extension entry ramp will be just to the east of the Marine Corps facility.
79 Where will the weekly on-site meetings be held during construction? Answering you question now vocally, but the answer is, yes.
80 What is Pinellas doing on that side to tap in Thank you for your question. They are two separate projects.
81 Thank you, looks like all my major concerns have been addressed in this presentation and it looks like a great benefit for all! Having the capability to exit South bound onto Dale Mabry will significantly improve my commute back home. Thank you for your input! Please feel free to visit the Selmonextension.com for any additional questions you may have.
82 But the noise will increase, just not significantly? Thank you for your question. The noise study will identify any areas of significant increase and noise mitigation methods will be utilized.
83 Is the person who is answering the questions during this virtual meeting going to tell everyone that if the overpass is built the rush hour traffic on Gandy is still going to be very bad and the local residents should not expect otherwise? Thank you for your question. Rush hour traffic will be significantly improved, however as you have noted it will still be rush hour traffic.
84 How will the water runoff from the raised level affect the lower level? where does it go? Thank you for your question. All stormwater runoff from the new structure will be piped directly from the existing underground outfall structures along the north side of Gandy Blvd thus reducing the effect on Gandy Blvd.
85 So we will be able to exit and enter the same way even during construction? Yes.
86 Thank you. Will the two lanes on the extension be divided by a concrete barrier. Yes.
87 Noise impact affecting residents South of Gandy? Thank you for your question. A new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
88 Any consideration to adding sound walls to diminish traffic noise along existing expressway? Thank you for your question. A new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
89 Will the power lines be removed from the sides of Gandy? All the existing electrical distributions currently crossing Gandy Blvd will be moved underground during the project.
90 What is happening on the Pinellas side to tie in? The Pinellas project is a Florida Department of Transportation Project. Basically they are creating overpasses at 4th and 9th Street
91 Have you guys done a presentation at our location or is one planned? Just wondering.. The Virtual Town Hall allows people to participate from the comfort of their homes rather than having to drive to a location after work. Having a recording of the Town Hall on the website gives the information a wider audience, again at a time and place that is convenient for them.

Also, we will come out and speak to you or your civic group about the extension or answer any questions you might have. Simply go to www.selmonextension.com, go to the Contact Us form and fill out the information.

92 during construction, will consideration be given to those businesses that are open 24 hours? you mentioned lane closures in the evening. During construction, THEA expects the contractor to minimize median turn lane closures. Temporary closures of some median-turning movements will occur during foundation construction. However the closures, if required, would be for short durations and usually at night. The final project will preserve all existing median-turn movements.

Since this project is constructed in the median of Gandy Boulevard, THEA will not be impacting the driveways of businesses along Gandy Boulevard during their peak business hours.

There will be weekly meetings with THEA and the business community, and an on-site dedicated public information officer. This will allow businesses a forum to address issues and will help to insure that timely and accurate construction information is distributed to the businesses and the community.

There will also be weekly construction updates, so again, I urge you to go to selmonextension.com and sign up for the updates.

93 Will a permit from SWFWMD for stormwater treatment or attenuation be required for this project? Yes, we are obtaining a permit from SWFWMD.
94 How will the water runoff be cleaned before running into the bay? We will over treat storm water runoff in the existing interchange area ponds.
95 How will the new extension effect sound? We are in the process of updating the Project Development & Environmental (PD&E) study and that document will include a noise impact study. The updated PD&E study will be posted on www.selmonextension.com.
96 Does THEA prefer a segmental bridge as shown in the rendering? Both concrete and steel structures are currently being evaluated by THEA.
97 will there be an off ramp to allow someone traveling east on selmon extension coming from St Pete to exit onto Dale Mabry. Yes, you enter just east of the bridge and either continue to the Selmon Expressway or queue jump to Dale Mabry
98 Will there be an exit on 4th St The Pinellas project is a Florida Department of Transportation project. The Express Lanes will have frontage roads, so that you can get to 4th and 9th. If you’re on the overpasses in Pinellas, you’re not stopping – you’re a regional traveler, just trying to get through the corridor.
99 Will THEA be holding one or more public meetings so the Gandy neighborhoods’ residents can show up to voice their displeasure of having their neighborhood main street ruined and still having to deal with horrible rush hour traffic? The Virtual Town Hall allows people to participate from the comfort of their homes rather than having to drive to a location after work. Having a recording of the Town Hall on the website gives the information a wider audience, again at a time and place that is convenient for them.

Also, we will come out and speak to you or your civic group about the extension or answer any questions you might have. Simply go to www.selmonextension.com, go to the Contact Us form and fill out the information.

100 Please explain the interchange s at Dale Mabry again thks The interchange will have the same movements that is has today. If you’re on the Expressway you can get off on Gandy Boulevard and go either east or west. With the extension in place, those options will still be available PLUS the option of staying on the extension to the Gandy Bridge.
101 will businesses have input as to the location of the piers so as not to dissect the entrance of a business? Thank you for your question. We plan to hold our next virtual town hall meeting in October on the topic of pier design. We hope you will participate!
102 how does the noise of traffic on the bridge expected to affect the residents? Thank you for your question. A new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
103 Are there any aesthetic requirements associated with the superstructure and/or substructure, i.e. closed box, segmental, etc. We will continue to seek public input for pier aesthetics and landscaping. Please refer to our Selmon Extension Website www.SelmonExtension.com to sign up for updates and input.
104 Is there any restriction in terms of left turn closures during construction? Thank you for your question. Any potential turn lane closures will be during non-peak business hours and will be as brief as possible.
105 The current exit and entrance to the Selmon is extreamly dangerous during rush hour. What are the plans to fix this? Thank you. The existing eastbound auxiliary lane between the exit and entrance ramps will be extended east to Gandy Blvd., providing an exclusive southbound turn lane. This will reduce the weaving movements and improve safety.
106 What happens when the road west of the bay is flooded at the entrance to the extension? Residents will be asked to evacuate 72 hours prior to landfall. The three bridges will not be closed until closer to the storm making landfall.
107 Has the contract been awarded? If so..what construction Co? Thanks for joining us. The contract has not been awarded yet.
108 Is there a redesign for the cloverleaf intersection on the southwest corner of Gandy and Dale Mabry for the new extension. Currently, the Gandy outside eastbound lane allows exiting, and entering traffic to crisscross. Thank you. The existing eastbound auxiliary lane between the exit and entrance ramps will be extended east to Gandy Blvd., providing an exclusive southbound turn lane. This will reduce the weaving movements and improve safety.
109 Will the new extension effect the noise level to residents ? Thank you for your question. A new noise study will be preformed according to FDOT standards. This noise study will identify locations where approved noise barriers may be utilized.
110 Is there a new West bound off ramp to Dale Mabry being constructed to elimenate the amount of traffic on the looped ramp on Gandy for drivers heading North on Dale Mabry? Thank you for your question. A new West Bound off ramp to Dale Mabry will be somewhat reconfigured to improve safety and operations.
111 The cut and cover option is the only option that will maintain Gandy’s main street character, and it is shown to be the most expensive option. THEA has stated to us they will not pay for this. Has THEA reached out to the FDOT to discuss supplemental funding to pay for this? FDOT has no plans to do any improvements on Gandy Boulevard.
112 Are there any emergency pull off lanes on the raised expressway or just two lanes fortraffic only Thanks for joining us. There will be plenty of room on the shoulder should you need to pull over on the Selmon Extension.
113 Will the timing be affected by the pinellas construction? Thanks for joining us tonight. No, the timing of our project will not be affected, as they are two different projects being done by two different agencies.
114 WHY AREN’T YOU ANSWERING ALL OF MY QUESTIONS???? Please be patient we have a lot of attendees and are trying to answer all the questions as quickly as possible. Thanks for patience.
115 Will there be any roadway lighting on the bridge? Yes, and we are looking at ways to minimize the spill over.
116 what are the plans for the Gandy Blvd. upgrade; sidewalks landscaping, bike lanes? Adding bike lanes would require right of way acquisition on both sides of Gandy from existing businesses. The Selmon Extension will be located in the media of Gandy Boulevard. We will not be purchasing any right of way; no businesses will be impacted.
117 Not sure who did the math, but 16,000 is not 40% of 45,175. Nor does it take into consideration the flow north from the Base, which still has to cross Gandy and will still cause significant congestion South of Gandy. I think it is a great idea as far as relieving, traffic across the bridge, but it will not ease the congestion leaving the base and heading north on either Manhattan or Gandy. The only way to do that is to add a direct access to the extension from the Base. Thank you for your question. There will be an entry to the Selmon Extension from Dale Mabry, just north of Gandy Blvd.
118 Thank you. I will patiently await a response to every question I asked, because they are all very important to me. I did document my questions. I would like to share your responses to the many people (friends and neighbors) who strongly oppose this project. Thank you. We have answered every question in the queue to this point in time. We will answer each and every question as quickly as we can. We appreciate your patience.
119 I know my questions are critical, but they are all very valid. It would have been nice if the person answering live would have addressed them. Ignoring questions that show the negative side of a project is misleading and diminishes credibility. Thank you for participating tonight.

Draft Design Traffic Technical Memorandum

Design Traffic

For Selmon West Extension Project Development and Environment (PD&E) Re-Evaluation Study
From the Gandy Bridge to the western terminus of the Selmon Expressway in Hillsborough County

Executive Summary

This document was prepared as part of the PD&E re-evaluation study for Gandy Boulevard (SR 600) from west of Westshore Boulevard to east of Dale Mabry Highway in Hillsborough County. The Gandy Boulevard corridor is primarily an east/west facility, which in its entirety, extends from a western terminus at Gulf Boulevard in Pinellas County to an eastern terminus at Bayshore Boulevard in Hillsborough County. The study corridor project location map is shown in Figure ES-1. The Gandy Boulevard corridor is functionally classified as an Urban Other Principal Arterial highway and is part of the Florida Strategic Intermodal System (SIS), which is a statewide network of high priority transportation facilities, including the State’s largest and most significant airports, spaceports, deepwater seaports, freight rail terminals, passenger rail and intercity bus terminals, rail corridors, waterways, and highways.

Traffic data was collected and existing conditions were evaluated including capacity, levels of service (AM and PM peak hours) and safety. Existing intersection and highway segment levels of service were typically LOS F along the Gandy Boulevard corridor…

Download the entire Updated Draft Design Traffic Technical Memorandum here.