November 5, 2018 Kym Graves

Blog – Bridge Deck Railing Face Lift

Selmon Extension crews are in the process removing and replacing the Dale Mabry and Gandy Boulevard overhead bridge traffic railing to bring it up to current code. This removal includes a small portion of the bridge deck along with the railing. Not only is the concrete railing shape being updated, so is the reinforcing steel in the deck that connects to the railing. This activity is scheduled to finish this month.

Print Friendly, PDF & Email

#LOVEYOURDRIVE

Get in touch with us!