March 11, 2020 Kym Graves

BLOG – East End Bridge Decks

The several large steel pieces that had been sitting on both sides of the road near the railroad tracks are now hanging up in the air on the east end. Those bridge deck overhang forms are for the elevated roadway.

The platforms are used to support the bridge overhang deck. Crews are scheduled to pour the first deck next month. Once the elevated concrete gets placed and cures, the forms will be safely removed.

Print Friendly, PDF & Email

#LOVEYOURDRIVE

Get in touch with us!