Selmon Extension Construction Alerts Week of December 14-20, 2019

Media Alert
December 13, 2019

Contact Information:
Kym Graves, Project Information Officer
Kym@SelmonExtension.com
813-613-2306

SELMON EXTENSION CONSTRUCTION ALERTS WEEK OF DECEMBER 14-20, 2019

  • Intermittent lane closures on Gandy Boulevard between Dale Mabry Highway and Church Street for construction activity between 9 pm – 6 am.
  • Median left-turn lane temporarily closed for safety reasons in front of the Gandy Plaza.
  • Sidewalk and crosswalk closure (between Westshore Office Center and Circle K) along the west side of Westshore Boulevard. Pedestrians will need to utilize the posted detour.
  • Westshore/Gandy Boulevard intersection; Northside: underground storm drainage work Southside: temporary lane configuration at the intersection.
  • Drivers should reduce speed while approaching the bottom off-ramp onto westbound Gandy Boulevard from the Expressway, a yield sign is in place.
  • The short merge still exists on eastbound Gandy between the CSX railroad tracks and Dale Mabry Highway at the entrance to the Selmon Expressway.
  • Sidewalk closure along eastbound Gandy Boulevard between the Dale Mabry Highway interchange and Lois Avenue.
  • Sidewalk closure on southbound Dale Mabry Highway between the Expressway overpass and the railroad tracks. Pedestrians walking on Dale Mabry will need to use the sidewalk on the east side of Dale Mabry.

Please remember the posted construction speed limit is 45 miles per hour. Speed enforcement will be in place in the signed construction zones.

###

SelmonExtension.com | @SelmonExtension | Facebook.com/SelmonExtension

Print Friendly, PDF & Email